Typical Lead Times for Install
Buildings 40' wide and less: 4-6 weeks
Buildings over 40' wide: 8-10 weeks
Exceptions
Remote and rural areas.
When do lead times start? Lead times start when the building site is ready, and photos of the concrete slab have been submitted to the manufacturer.
When is a telehandler required?
A telehandler is required when the building width is more than 30', or if the sidewall height is more than 13'.