Installation

  • Alex Walker
  • Jan 13
  • 1 min read

Updated: Jun 24

Typical Lead Times for Install

Buildings up to 30' wide: 3-5 weeks

Buildings over 30' wide: 4-8 weeks


When do lead times start? Lead times start when the building site is ready, and photos of the concrete slab have been submitted to the manufacturer.


When is a telehandler required?

A telehandler is required when the building width is more than 30', or if the sidewall height is 14' or higher.