Installation
- Alex Walker
- Jan 13
- 1 min read
Updated: Jun 24
Typical Lead Times for Install
Buildings up to 30' wide: 3-5 weeks
Buildings over 30' wide: 4-8 weeks
When do lead times start? Lead times start when the building site is ready, and photos of the concrete slab have been submitted to the manufacturer.
When is a telehandler required?
A telehandler is required when the building width is more than 30', or if the sidewall height is 14' or higher.